Skip to main content

Difference between SMV & SAM

 Difference between SMV & SAM

SMV & SAM ,IE ,

SAM means the Standard Allowed Minutes and SMV means Standard Minute Value are both primarily used in the garments manufacturing industry. These two topics are industrial engineering terms. And primarily used in industry to measure and manage work performance, efficiency, and productivity. These subjects play in a crucial role in optimizing production processes, enhancing efficiency, and regulating the costs

 SAM (Standard Allowed Minutes)

Standard Allowed Minutes is the time-based measuring system that is used to evaluating of the time required to complete a specific work or operation. It serves as a standard reference for work measurement and performance evaluation. SAM is usually expressed in minutes per operation or task and is determined through thorough time and motion studies.

Applications of SAM

In garment manufacturing, SAM is used for various purposes, such as:

Establishing production targets: By knowing the SAM for each operation, manufacturers can set achievable targets for workers and production lines.

Work measurement: SAM helps to assess the productivity of workers by comparing their actual output to the expected output based on the SAM.

Cost estimation: SAM is crucial in estimating the labor cost for producing a garment, which allows manufacturers to set appropriate prices and remain competitive.

 

Calculating SAM

The SAM calculation involves breaking down each operation into its constituent elements and analyzing the time required for each element. The total time for all aspects gives the SAM for that specific operation. Accurate time and motion studies are critical for obtaining reliable SAM values.

Standard Minute Value

SMV, or Standard Minute Value, is a predetermined time value established for completing a specific task or operation. Unlike SAM, which is based on observed time studies, SMV is determined using historical data, statistical analysis, and industrial engineering expertise. SMV is expressed in minutes and is independent of the worker's performance.

Applications of SMV

SMV is widely used in the garment manufacturing industry for several purposes, including:

 

 Line balancing: SMV assists in distributing work evenly across different workstations, ensuring that no bottleneck occurs in the production line.

Incentive systems: Some manufacturers use SMV as the basis for incentive schemes, rewarding workers who complete tasks faster than the predetermined SMV.

Performance evaluation: SMV provides a consistent benchmark to evaluate worker performance and identify areas for improvement.

Calculating SMV

Calculating SMV involves a comprehensive analysis of historical data, time and motion studies, and expert judgment. It is a complex process that requires experienced industrial engineers to arrive at accurate SMV values.

Key Differences between SAM and SMV

Basis of Calculation:

SAM is determined through time and motion studies, which involve observing workers performing tasks to calculate the time taken for each element.

SMV, on the other hand, is based on historical data and expert analysis and is independent of the worker's performance.

Nature of Measurement:

SAM is a measured value that represents the standard time required for a worker to complete an operation.

SMV is a predetermined value established before the start of production and remains constant regardless of the worker's performance.

Worker Performance:

SAM is influenced by the worker's skills, efficiency, and other performance factors.

SMV is not influenced by individual worker performance and is considered a more stable benchmark for evaluation.

Use in Incentive Systems:

SAM is often used as a basis for incentive schemes, where workers are rewarded for completing tasks faster than the SAM.

SMV can also be used for incentives, but it requires careful consideration of worker efficiency and historical data.

Flexibility:

SAM values may vary depending on the worker's skill level and proficiency, making it a more flexible measurement.

SMV is standardized and less flexible, as it remains constant regardless of individual performance.

Conclusion

In summary, both SAM and SMV are critical tools in the garment manufacturing industry for assessing performance, setting production targets, and controlling costs. SAM is based on measured time studies and reflects individual worker performance, while SMV is a predetermined value based on historical data and remains constant. Manufacturers can choose to use either SAM or SMV or a combination of both, depending on their specific production requirements and management objectives. By effectively implementing these tools, garment manufacturers can achieve higher efficiency, better resource allocation, and enhanced competitiveness in the global market.

Comments

Popular posts from this blog

Industrial Engineering

  Industrial engineering (IE): Industrial engineering (IE)  means that deals with the optimization of processes, systems, and organizations. In the garments industry, IE improves efficiency, productivity, and quality and reduces wastage and cost. Some of the essential  tasks of the  IE professionals that perform in the garments industry : Line balancing : Optimizing the number of workers and machines on a production line to ensure that each worker is always busy and that the line is running as efficiently as possible. Work measurement: Developing standard times for tasks, which can be used to set production targets and to identify areas where productivity can be improved. Inventory control: Managing the flow of materials through the production process to ensure enough inventory to meet demand without too much excess inventory. Quality control:  Developing and implementing procedures to ensure that garments meet quality standards. Ergonomics:  De...

Industrial Engineering Formula

Industrial Engineering Formula I ndustrial engineering is various principles and techniques applied in different contexts. Here are some commonly used formulas in industrial engineering: Daily Line Target =(Total Working minutes in a day ×No.of operators×Line Efficiency %)/(SMV/SAM) Individual Operator target=(Total Working minutes in a day×Line efficiency%)/(operation SMV/SAM)  Operator Efficiency% (individual)=  (Total pieces produced×operation SMV/SAM×100)/(Total Minutes Worked) Line  Efficiency%=(Line output ×Garment SAM/SMV×100)/(Total no.of operators×Minutes Worked) Machine  Productivity=(Line Output(pieces))/(number of machine used) Labour Productivity=(Line output (Pieces)/(Number of  workers (including operator and helper)) Line work in process (WIP)=Total pieces-Total output Standard time=(Observed time×Observed Rating )+Allowances Machine  Utilization%=(Actual machine running time ia working day ×100)/(Total  time available  in ...

Role of Industrial Engineer

IE Role  Role of Industrial Engineer: The primary responsibility of Industrial engineers is to optimize the production processes, to improve efficiency, productivity, and quality, and minimize the cost. Some critical roles and responsibilities of industrial engineers are described below the garments: Analyzing and Improvement of the Process: Industrial engineers improve production and efficiency by analyzing the existing production processes and identifying areas for improvement. By studying the workflow, identifying bottlenecks, and implementing strategies to streamline operations, reduce waste, and increase overall efficiency. Planning and Scheduling: Industrial engineers develop production plans and schedules by considering order quantities, available resources, and delivery deadlines. They ensure the production line is properly sequenced and balanced to optimize throughput and minimize idle time. Designing the workstation and Layout: Industrial engineers maximize p...